产品咨询
售后咨询
客户留言
| Pump for energy saving retrofit | Power saving rate | Annual electricity saving |
| Reconstruction of water pumping station in the Second Water Plant(2 pumps) | 19% | 480 thousand |
| Reconstruction of two water pumping station in the Second Water Plant(2 pumps) | 20% | 500 thousand |
| Slag pump stationReconstruction(1 pump) | 22% | 220 thousand |
Hubei Jinhuan water plant has 3 sets of water intake and slag water delivery systems and 5 water pumps, with a total reconstruction capacity of about 720kw, an average power saving rate of 20%, a small season of 144kwh, and an annual power saving of about 1.2 million kwh. According to the electricity price of 0.7 yuan / kwh, the annual power saving is 840000 yuan.



产品咨询
售后咨询
客户留言